Landsdowne The Strand Hotel

The Team worked on the refurbishment of the roof on the old building at the back of the Strand Hotel.

This was a very complicated and challenging project but the team really did exceptionally well.

 

Ashton Meadows Care Home

A 32 bed new build care home based in Kingston upon Thames.

We carried out all aspects of carpentry on this project including the  Truss roof with cut elements, forming of dormer windows and all internal works including beading and paneling.

Bitham Brook School

This project was an extension to an existing school. Hope completed all structural rood work and internal finishes, including doors, frames, architraves, ironmongery, screens, skirting, kitchens and IPS Panels.

Cricklade Leisure Centre

We have recently completed a project at Cricklade which involved the refurbishment of the centre and swimming pool area. Including work to the replacement roof, stud work, and fire rated partitions, new door sets, 2nd fix timber items, ironmongery as well as kitchens and specialist items.